Thứ Hai, 17 tháng 5, 2021

CÁC DỰ ÁN ĐÃ THỰC HIỆN

👉 PROJECT NO.: Industrial Waste Incinerator Project

Year: From July 2019 to december 2019 
Location: Phu Lang commune, Que Vo district, Bac Ninh province, Vietnam
Client: Green Star Co., Ltd & Chosun Refractories ENG Co., Ltd.
Supervision Consultant: CIMAS Co., Ltd
Stage: Design Foundation and Structural for the Construction Stage
Responsibilities:

  • Analyzed geotechnical investigation data and calculated Pile Bearing Capacity with consideration to the impacts of Negative Skin Friction;
  • Design standard drawings for PHC pile;
  • Technical Bid Evaluation for choosing the Geotechnical Investigation and Topographical Survey contractor;
  • Supervised the geotechnical investigation works at site, controlled the progress/milestone, made daily report to the leader;
  • Reviewed/re-checked and given comments for the geotechnical analysis/recommendation and final report for the contractor.
  • Technical Bid Evaluation for choosing the contractor of pile supply and construction;
  • Supervision of pile testing and pile construction. Review/re-check and given comments the pile test results for the contractor.

👉 PROJECT NO.: CFP Crude Oil Tank Project

Year: From February to June 2019 
Location: Sriracha, Chonburi Province, Thailand
Client: Thai Oil Public Co., Ltd
Supervision Consultant: CTCI (Thailand) Co., Ltd
Stage: Design Foundation and Structural for the Construction Stage
Responsibilities:
  • Analysis and design Mechanically Stabilized Earth Wall;
  • Design foundation and structural for dike system around tank;
  • Analyzed geotechnical investigation data, calculated bearing capacity for Pile and Shallow foundation.
👉 PROJECT NO.: VINASANFU Chemicals Transfilling Termical Project


Year: From August 2018 to January 2019 
Location: Land Plot CN5.5B & CN5.5C, Dinh Vu Industrial Zone, Dong Hai Ward, Hai An District, Hai Phong City, Vietnam
Client: VINASANFU Material Co., Ltd
Supervision Consultant: CIMAS Co., Ltd
Stage: Design Foundation and Structural for the Construction Stage
Responsibilities:

  • Analyzed geotechnical investigation data and calculated Pile Bearing Capacity with consideration to the impacts of Negative Skin Friction;
  • Design standard drawings for PHC pile;
  • Technical Bid Evaluation for choosing the Geotechnical Investigation and Topographical Survey contractor;
  • Supervised the geotechnical investigation works at site, controlled the progress/milestone, made daily report to the leader;
  • Reviewed/re-checked and given comments for the geotechnical analysis/recommendation and final report for the contractor.
  • Technical Bid Evaluation for choosing the contractor of pile supply and construction;
  • Supervision of pile testing and pile construction. Review/re-check and given comments the pile test results for the contractor.

    👉 PROJECT NO.: MAXIHUB CPC TANK FARM PROJECT



    CPTu test at Site
    Year: From August to December, 2016 and from September, 2017 up to now.
    Location: Ong Keo Industrial Zone, Nhon Trach District, Dong Nai Province, Vietnam
    Client: MAXIHUB Co., Ltd
    Supervision Consultant: 
    Stage: Design Foundation and Structural for the Construction Stage
    Responsibilities:
    • Analyzed geotechnical investigation data and calculated Pile Bearing Capacity with consideration to the impacts of Negative Skin Friction;
    • Calculated primary consolidation settlement and residual settlement of ground under embankment load. Thereby, given the solution for soft soil treatment by using wick drains (PVD);
    • Technical Bid Evaluation for choosing the Geotechnical Investigation and Topographical Survey contractor;
    • Supervised the geotechnical investigation works at site, controlled the progress/milestone, made daily report to the leader;
    • Reviewed/re-checked and given comments for the geotechnical analysis/recommendation and final report for the contractor.
    • Technical Bid Evaluation for choosing the contractor of pile supply and construction;
    • Supervision of pile testing and pile construction. Review/re-check and given comments the pile test results for the contractor.
    👉 PROJECT NO.: COAL CHEMICAL PLANT PROJECT
    Activities at Site
    Year: From July, 2016 to present
    Location: Vung Ang economic zone, Ha Tinh province, Vietnam
    Client: Formosa Ha Tinh Steel Corporation (FHS)
    Supervision Consultant: 
    Stage: Design Foundation and Structural for the Construction Stage
    Responsibilities: Make requisition for the Soil Investigation; Analyze and control Soil properties, calculate and give the foundation solutions for the construction; Design foundation for Tank, Dike, Equipment and Pump, etc.

    👉 PROJECT NO.: COOLING WATER PIPE SYSTEM – THAI BINH POWER PLANT (2X30MW) PROJECT
    Activities at Site
    Year: From June to December, 2015
    Location: My Loc commune, Thai Thuy district, Thai Binh province, Vietnam
    Client: Vietnam Electricity (EVN)
    Supervision Consultant: FICHTNER GmbH & Co KG/ TEPSCO and FECC1
    Stage: Design Foundation and Structural for the Construction Stage
    Responsibilities: Make requisition for the Soil Investigation; Analyze and control Soil properties, calculate and give the foundation solutions for the construction.

    👉 PROJECT NO.: COOLING INDUSTRIAL WASTE POWER GENERATION SYSTEM PROJECT
    Activities at Site
    Year: From November, 2014 to February, 2015
    Location: Nam Son, Soc Son district, Hanoi, Vietnam
    Client: Hanoi Urban Environment Company (URENCO)
    Supervision Consultant: Consultant and Inspection Joint Stock Company of Construction Technology and Equipment (CONINCO., JSC)
    Stage: Design Foundation and Structural for the Construction Stage
    Responsibilities: Make requisition for the Soil Investigation; Analyze and control Soil properties, calculate and give the foundation solutions for the construction.

    👉 PROJECT NO.: NGHI SON REFINERY AND PETROCHEMICAL COMPLEX PROJECT - NSRP
    Activities at Site
    Year: From May to August, 2014
    Location: Nghi Son, Thanh Hoa, Vietnam
    Client: Hydrographical Survey Enterprise for Marine Safety in the North (HSE-N)
    Supervision Consultant: HYUNDAI E&C
    Stage: Bathymectric Survey for the Construction Stage
    Responsibilities: CAD operator; Prepare shop drawings of the project; Seismic and Side Scan Sonar Interpretation.

    👉 PROJECT NO.: NHAT TAN BRIDGE CONSTRUCTION PROJECT, PACKAGE 2 - SOUTH APPROACH BRIDGE AND ROAD
    Activities at Site
    Year: From May to December, 2012
    Location: Dong Anh, Hanoi, Vietnam
    Client: Ministry of Transport, Project management unit 85
    Supervision Consultant: CHODAI - NE - TEDI
    Stage: Geotechnical Investigation for the Detailed Design Stage
    Responsibilities: Site Engineer
    Responsible for technical supervision of soil boring includes check and control soil in-situ tests such as CPTu test, field vane shear test, Standard penetration test, Pocket penetrometer test in accordance with specification as well as TCVN and ASTM standards. Check and control the laboratory tests, literature synthesis of geological and write down geotechnical report.

    👉 PROJECT NO.: THE STUDY ON STRENGTHENING COMPETITIVENESS AND DEVELOPMENT OF SIHANOUKVILLE PORT IN THE KINGDOM OF CAMBODIA
    Activities at Site
    Year: From October to December, 2011
    Location: Sihanoukville, Cambodia
    Client: Port Authority of Sihanoukville
    Supervision Consultant: Joint Venture of Nippon Koei Co., Ltd and Oriental Consultant Ltd.
    Stage: Geotechnical Investigation for the Detailed Design Stage
    Responsibilities: Responsible for supervision of Soil Investigation, quality control of boring works such as soil sampling, soil properties control; give the conclusions and recommendations for the foundation design.

    👉 PROJECT NO.: SIHANUOKVILLE PORT DEVELOPMENT FOR MULTIPURPOSE TERMINAL IN THE KINGDOM OF CAMBODIA
    Activities at Site
    Year: From August to October, 2011
    Location: Sihanoukville, Cambodia
    Client: Port Authority of Sihanoukville
    Supervision Consultant: Joint Venture of Nippon Koei Co., Ltd and Oriental Consultant Ltd.
    Stage: Geotechnical Investigation for the Detailed Design Stage
    Responsibilities: Responsible for supervision of Soil Investigation, quality control of boring works such as soil sampling, soil properties control; give the conclusions and recommendations for the foundation design.

    👉 PROJECT NO.: CUA LO DEEP SEAPORT PROJECT

    Activities at Site
    Year: From July to December, 2011
    Location: Nghi Thiet ward, Cua Lo town, Nghe An province, Vietnam
    Client: International Transportation Investment and Development JSC. (ITID)
    Supervision Consultant: Japan Port Consultant (JPC)
    Stage: Geotechnical Investigation for the Detailed Design Stage
    Responsibilities: Responsible for supervision of Soil Investigation, quality control of boring works such as soil sampling, soil properties control; give the conclusions and recommendations for the foundation design.

    👉 PROJECT NO.: DONG LAM CEMENT SPECIALIZED SEAPORT PROJECT
    Activities at Site
    Year: From July to December, 2011
    Location: Dien Loc ward, Phong Dien Distric, Hue province, Vietnam
    Client: International Transportation Investment and Development JSC. (ITID)
    Supervision Consultant: Japan Port Consultant (JPC)
    Stage: Geotechnical Investigation for the Detailed Design Stage
    Responsibilities: Responsible for supervision of Soil Investigation, quality control of boring works such as soil sampling, soil properties control; give the conclusions and recommendations for the foundation design.



    ------------------------------------

    0 Nhận xét:

    Đăng nhận xét

     
    icon zalo